Heath-consultants Gas Delivery Unit (GDUnet) Manual do Utilizador Página 91

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 109
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 90
GDUnet OPERATION
5-9
5.3 STANDARD OPERATION
net is connected to a mains power supply, the
green POWER ON        
shown in Fig. 5-11.
Fig. 5-11 Power On
The following start up sequence will begin:
1. 
light will be on but no messages are present.
2. After approximately 30 seconds the buzzer will sound and

3. 

INSERT GMI’.
net.)
4. 
Note: The start-up sequence gives the opportunity to
observe the test LEDs and buzzer are functioning
correctly.
Vista de página 90
1 2 ... 86 87 88 89 90 91 92 93 94 95 96 ... 108 109

Comentários a estes Manuais

Sem comentários